Inspection Procedure
- CHECK HARNESS AND CONNECTOR (COMMUNICATION LINE)
- Disconnect the P2 and P5 ECU connectors.
- Measure the resistance according to the value(s) in the table below.
Standard Resistance
RESISTANCE SPECIFICATIONTester Connection Condition Specified Condition P2-23 (MPX1) - P5-5 (S1) Always Below 1 Ω NG: REPAIR OR REPLACE HARNESS OR CONNECTOR
Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
OK: Go to next step
- CHECK HARNESS AND CONNECTOR (TELEPHONE ECU ASSEMBLY - VEHICLE BATTERY AND BODY GROUND)
- Disconnect the P2 ECU connector.
- Measure the voltage and resistance according to the value(s) in the table below.
Standard Voltage
VOLTAGE SPECIFICATIONTester Connection Condition Specified Condition P2-1 (+B) - Body ground Always 11 to 14 V Standard Resistance
RESISTANCE SPECIFICATIONTester Connection Condition Specified Condition P2-12 (E) - Body ground Always Below 1 Ω NG: REPAIR OR REPLACE HARNESS OR CONNECTOR
Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
OK: Go to next step
- REPLACE TELEPHONE ECU ASSEMBLY TOGETHER WITH MAYDAY BATTERY
NEXT: PERFORM REGISTRATION (See REGISTRATION )