Emission Control: Canister: Installation
- INSTALL CHARCOAL CANISTER ASSEMBLY
- Install the charcoal canister assembly with the 4 nuts.
Torque: 15 N*m (150 kgf*cm, 11 ft.*lbf)
- Connect the 2 quick connectors, hose and connector.
- Connect the wire harness with the 2 clamps.
- Install the charcoal canister assembly with the 4 nuts.
- INSTALL NO. 1 FLOOR UNDER COVER
- Install the No. 1 floor under cover with the 3 nuts and 6 clips.
- CONNECT CABLE TO NEGATIVE BATTERY TERMINAL NOTE: When disconnecting the cable, some systems need to be initialized after the cable is reconnected (See INITIALIZATION ).