LEMON Manuals: Even more car manuals for everyone
Home >> Lexus >> 2008 >> IS 350 >> Repair and Diagnosis >> External Pages >> Different car >> Section 52 (A760H Automatic Transaxle) >> Shift Lever Assembly >> Installation

Shift Lever Assembly: Installation

WARNING: This page is about a different car, the 2008 Lexus IS 250. However, it is still accessible from the selected car via links, so may be relevant.
  1. INSTALL TRANSMISSION FLOOR SHIFT ASSEMBLY 
    1. Install the floor shift assembly with the 4 bolts.

      Torque: 8.3 N*m (85 kgf*cm, 73 in.*lbf) 

    2. Connect the connector to the floor shift assembly.
      Fig 1: Locating Connectors And Bolts
      G05318245Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
  2. INSTALL FLOOR SHIFT GEAR SHIFTING ROD SUB-ASSEMBLY 
    1. Install the floor shift gear shifting rod sub-assembly with the nut.

      Torque: 13 N*m (133 kgf*cm, 9 ft.*lbf) 

      Fig 2: Locating Nut
      G05317640Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
  3. INSTALL FRONT FLOOR NO. 1 HEAT INSULATOR  (See INSTALLATION )
  4. INSTALL EXHAUST PIPE ASSEMBLY FRONT  (See INSTALLATION )
  5. INSTALL OXYGEN SENSOR  (See INSTALLATION )
  6. INSTALL FRONT CENTER FLOOR BRACE  (See INSTALLATION )
  7. INSTALL NO. 1 REAR FLOOR PANEL BRACE  (See INSTALLATION )
  8. INSTALL NO. 2 CONSOLE BOX DUCT  (See INSTALLATION )
  9. INSTALL CONSOLE BOX  (See INSTALLATION )
  10. INSTALL CONSOLE BOX REGISTER ASSEMBLY  (See INSTALLATION )
  11. INSTALL FRONT ASH RECEPTACLE SUB-ASSEMBLY  (See INSTALLATION )
  12. INSTALL CONSOLE PANEL SUB-ASSEMBLY  (See INSTALLATION )
  13. INSTALL UPPER NO. 2 CONSOLE PANEL GARNISH  (See INSTALLATION )
  14. INSTALL UPPER NO. 1 CONSOLE PANEL GARNISH  (See INSTALLATION )
  15. INSTALL SHIFT LEVER KNOB SUB-ASSEMBLY 
  16. ADJUST SHIFT LEVER POSITION  (See ADJUSTMENT  )
  17. INSPECT SHIFT LEVER POSITION  (See ON-VEHICLE INSPECTION  )
  18. CHECK FOR EXHAUST GAS LEAKS  (See INSTALLATION )