Inspection Procedure
- PERFORM ACTIVE TEST USING TECHSTREAM
- Connect the Techstream to the DLC3.
- Turn the engine switch on (IG).
- Turn the Techstream on.
- Enter the following menus: Body Electrical / Combination Meter / Active Test.
- Check the CRUISE main indicator light by performing the Active Test.
Combination Meter:
ACTIVE TESTTester Display Test Part Control Range Diagnostic Note Indicat. Lamp Cruise Turns CRUISE main indicator light BLINK/OFF - OK: Indicator light blinks/goes off.
NG: REPLACE COMBINATION METER ASSEMBLY
OK: Go to Next Step
- READ VALUE USING TECHSTREAM
- Connect the Techstream to the DLC3.
- Turn the engine switch on (IG).
- Turn the Techstream on.
- Enter the following menus: Powertrain / Cruise Control / Data List.
- Check the Data List for proper functioning of the CRUISE main indicator light.
ECM (Cruise Control):
DATA LISTTester Display Test Part Control Range Diagnostic Note CCS Indicator M-CPU Cruise indicator signal (Main CPU)/ON or OFF ON: "CRUISE" on
OFF: "CRUISE" off- OK: When the cruise control main switch is operated, the display changes as shown above.
NG: REPLACE ECM
OK: PROCEED TO NEXT CIRCUIT INSPECTION SHOWN IN PROBLEM SYMPTOMS TABLE