Inspection Procedure
- CHECK WIRE HARNESS (BATT, ACC, IG, GND)
- Turn the engine switch off.
- Disconnect the gateway ECU connector (J76).
- Measure the resistance according to the value (s) in the table below.
Standard resistance
RESISTANCE SPECIFICATION CHARTTester Connection Condition Specified Value J76-24 (GND) - Body ground Always Below 1 Ω - Measure the voltage according to the value (s) in the table below.
Standard voltage
VOLTAGE SPECIFICATION CHARTTester Connection Condition Specified Value J76-10 (BATT) - Body ground Always 10 to 14 V J76-2 (ACC) - Body ground Engine switch on (IG) 10 to 14 V J76-1 (IG) - Body ground Engine switch on (IG) 10 to 14 V NG: REPAIR OR REPLACE HARNESS OR CONNECTOR
OK: REPLACE GATEWAY ECU