LEMON Manuals: Even more car manuals for everyone
Home >> Lexus >> 2008 >> IS 250 AWD >> Repair and Diagnosis >> External Pages >> Different variant/trim >> Section 1 (A960E Automatic Transaxle) >> Shift Solenoid Valve >> Inspection

Shift Solenoid Valve: Inspection

WARNING: This page is about a different variant/trim than selected.
  1. INSPECT SHIFT SOLENOID VALVE SL1 
    1. Measure the resistance according to the value(s) in the table below.

      Standard resistance 

      STANDARD RESISTANCE SPECIFICATION

      Tester Connection Specified Condition 20°C (68°F)
      1 - 2 5.0 to 5.6 Ω
    2. Connect the positive (+) lead with a 21 W bulb to terminal 2 and the negative (-) lead to terminal 1 of the solenoid valve connector, then check the operation of the valve.

      OK: The solenoid makes an operating sound. 

      If the resistance is not within the specified range, replace the shift solenoid valve SL1.

    Fig 1: Inspecting Shift Solenoid Valve SL1
    G05288661Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
  2. INSPECT SHIFT SOLENOID VALVE S1 
    1. Measure the resistance according to the value(s) in the table below.

      Standard resistance 

      STANDARD RESISTANCE SPECIFICATION

      Tester Connection Specified Condition 20°C (68°F)
      Solenoid Connector (S1) - Solenoid Body(S1) 11 to 15 Ω
    2. Connect the positive (+) lead to the terminal of the solenoid connector, and the negative (-) lead to the solenoid body, then check the operation of the valve.
      Fig 2: Inspecting Shift Solenoid Valve S1
      G05288662Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002

      OK: The solenoid makes an operating sound. 

      If the resistance is not within the specified range, replace the shift solenoid valve S1.

  3. INSPECT SHIFT SOLENOID VALVE S2 
    1. Measure the resistance according to the value(s) in the table below.

      Standard resistance 

      STANDARD RESISTANCE SPECIFICATION

      Tester Connection Specified Condition 20°C (68°F)
      Solenoid Connector (S2) - Solenoid Body (S2) 11 to 15 Ω
    2. Connect the positive (+) lead to the terminal of the solenoid connector, and the negative (-) lead to the solenoid body.
      Fig 3: Inspecting Shift Solenoid Valve S2
      G05288663Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002

      OK: The solenoid makes an operating noise. 

      If the resistance is not within the specified range, replace the shift solenoid valve S2.

  4. INSPECT SHIFT SOLENOID VALVE S3 
    1. Measure the resistance according to the value(s) in the table below.

      Standard resistance 

      STANDARD RESISTANCE SPECIFICATION

      Tester Connection Specified Condition 20°C (68°F)
      Solenoid Connector (S3) - Solenoid Body (S3) 11 to 15 Ω
    2. Connect the positive (+) lead to the terminal of the solenoid connector, and the negative (-) lead to the solenoid body, then check the operation of the valve.
      Fig 4: Inspecting Shift Solenoid Valve S3
      G05288664Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002

      OK: The solenoid makes an operating sound. 

      If the resistance is not within the specified range, replace the shift solenoid valve S3.

  5. INSPECT SHIFT SOLENOID VALVE S4 
    1. Measure the resistance according to the value(s) in the table below.

      Standard resistance 

      STANDARD RESISTANCE SPECIFICATION

      Tester Connection Specified Condition 20°C (68°F)
      Solenoid Connector (S4) - Solenoid Body (S4) 11 to 15 Ω
    2. Connect the positive (+) lead to the terminal of the solenoid connector, and the negative (-) lead to the solenoid body.
      Fig 5: Inspecting Shift Solenoid Valve S4
      G05318615Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002

      OK: The solenoid makes an operating sound. 

      If the resistance is not within the specified range, replace the shift solenoid valve S4.

  6. INSPECT SHIFT SOLENOID VALVE SL2 
    1. Measure the resistance according to the value(s) in the table below.

      Standard resistance 

      STANDARD RESISTANCE SPECIFICATION

      Tester Connection Specified Condition 20°C (68°F)
      1 - 2 5.0 to 5.6 Ω
    2. Connect the positive (+) lead with a 21 W bulb to terminal 2 and the negative (-) lead to terminal 1 of the solenoid valve connector, then check the operation of the valve.

      OK: The solenoid makes an operating sound. 

      If the resistance is not within the specified range, replace the shift solenoid valve SL2.

    Fig 6: Inspecting Shift Solenoid Valve SL2
    G05288666Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
  7. INSPECT SHIFT SOLENOID VALVE SR 
    1. Measure the resistance according to the value(s) in the table below.

      Standard resistance 

      STANDARD RESISTANCE SPECIFICATION

      Tester Connection Specified Condition 20°C (68°F)
      Solenoid Connector (SR) - Solenoid Body (SR) 11 to 15 Ω
      Fig 7: Checking Resistance Between Shift Solenoid Valve SR Terminal And Solenoid Body
      G05288667Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    2. Connect the positive (+) lead to the terminal of the solenoid valve connector, and the negative (-) lead to the solenoid body, then check the operation of the valve.

      OK: The solenoid makes an operating sound. 

      If the resistance is not within the specified range, replace the shift solenoid valve SR.

  8. INSPECT SHIFT SOLENOID VALVE SLT 
    1. Measure the resistance according to the value(s) in the table below.

      Standard resistance 

      STANDARD RESISTANCE SPECIFICATION

      Tester Connection Specified Condition 20°C (68°F)
      1 - 2 5.0 to 5.6 Ω
    2. Connect the positive (+) lead with a 21 W bulb to terminal 2 and the negative (-) lead to terminal 1 of the solenoid valve connector, then check the operation of the valve.

      OK: The solenoid makes an operating sound. 

      If the resistance is not within the specified range, replace the shift solenoid valve SLT.

    Fig 8: Inspecting Shift Solenoid Valve SLT
    G05288668Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
  9. INSPECT SHIFT SOLENOID VALVE SLU 
    1. Measure the resistance according to the value(s) in the table below.

      Standard resistance 

      STANDARD RESISTANCE SPECIFICATION

      Tester Connection Specified Condition 20°C (68°F)
      1 - 2 5.0 to 5.6 Ω
    2. Connect the positive (+) lead with a 21 W bulb to terminal 2 and the negative (-) lead to terminal 1 of the solenoid valve connector, then check the operation of the valve.

      OK: The solenoid makes an operating sound. 

      If the resistance is not within the specified range, replace the shift solenoid valve SLU.

      Fig 9: Inspecting Shift Solenoid Valve SLU
      G05288669Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002