Floor Shift Assembly: Installation
- INSTALL FLOOR SHIFT ASSEMBLY
- Install the floor shift with the 4 bolts.
Torque: 8.3 N*m (85 kgf*cm, 73 in.*lbf)
- Connect the 2 connectors to the floor shift.
- Connect the 6 clamps.
- Install the floor shift with the 4 bolts.
- CONNECT FLOOR SHIFT GEAR SHIFTING ROD SUB-ASSEMBLY
- Temporarily tighten the floor shift gear shifting rod with the nut.
HINT:
The rod is tightened to a torque specification in the "ADJUST SHIFT LEVER POSITION" procedure.
- Temporarily tighten the floor shift gear shifting rod with the nut.
- ADJUST SHIFT LEVER POSITION (See ADJUSTMENT )
- INSTALL FRONT FLOOR NO. 1 HEAT INSULATOR (See INSTALLATION )
- INSTALL FRONT EXHAUST PIPE ASSEMBLY
Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
- Install the front exhaust pipe (see INSTALLATION ).
- INSTALL NO. 2 ENGINE UNDER COVER
- INSTALL NO. 2 CONSOLE BOX DUCT (See INSTALLATION )
- INSTALL CONSOLE BOX (See INSTALLATION )
- INSTALL CONSOLE BOX REGISTER ASSEMBLY (See INSTALLATION )
- REMOVE CONSOLE BOX PLATE (See INSTALLATION )
- INSTALL INSTRUMENT PANEL FINISH PANEL END LH (See INSTALLATION )
- INSTALL INSTRUMENT PANEL FINISH PANEL END RH (See INSTALLATION )
- INSTALL CONSOLE UPPER PANEL ASSEMBLY (See INSTALLATION )
- INSTALL FRONT CONSOLE UPPER PANEL GARNISH (See INSTALLATION )
- INSTALL SHIFT LEVER KNOB SUB-ASSEMBLY
- CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
- INSPECT SHIFT LEVER POSITION (See ON-VEHICLE INSPECTION )
- PERFORM INITIALIZATION
- Perform initialization (see
INITIALIZATION
).NOTE: Certain systems need to be initialized after disconnecting and reconnecting the cable from the negative (-) battery terminal.
- Perform initialization (see
INITIALIZATION
).