Cooling System (Mechanical): Cooling: Fan: Installation
- INSTALL COOLING FAN MOTOR
- Install the fan motor with the 3 screws.
Torque: 5.0 N*m (51 kgf*cm, 44 in.*lbf)
- Install the fan motor with the 3 screws.
- INSTALL NO. 2 COOLING FAN MOTOR
- Install the fan motor with the 3 screws.
Torque: 5.0 N*m (51 kgf*cm, 44 in.*lbf)
- Connect the 2 wires to the fan shroud.
- Install the fan motor with the 3 screws.
- INSTALL FAN
- Install the 2 fans with the 2 nuts.
Torque: 5.0 N*m (51 kgf*cm, 44 in.*lbf)
- Install the 2 fans with the 2 nuts.
- INSTALL COOLING FAN ECU
- Install the ECU with the 2 screws.
- Connect the 2 connectors.
- INSTALL FAN SHROUD SUB-ASSEMBLY
- Install the fan shroud with the 6 bolts.
Torque: 5.0 N*m (51 kgf*cm, 44 in.*lbf)
- Connect the 3 clamps and wire harness to the fan shroud.
- Connect the 2 connectors.
- Install the fan shroud with the 6 bolts.
- INSTALL ENGINE ROOM ECU OUTLET DUCT
- Install the outlet duct.
- CONNECT NO. 1 RADIATOR HOSE (See INSTALLATION )
- INSTALL AIR CLEANER ASSEMBLY (See INSTALLATION )
- INSTALL INTAKE AIR CONNECTOR PIPE (See INSTALLATION )
- INSTALL RADIATOR RESERVE TANK ASSEMBLY
- Install the reserve tank with the 2 bolts.
- Squeeze the clip and install the reserve tank inlet hose to the radiator assembly.
- INSTALL NO. 1 AIR CLEANER INLET (See INSTALLATION )
- ADD ENGINE COOLANT (See COOLANT )
- CHECK FOR ENGINE COOLANT LEAKS (See COOLING SYSTEM )
- INSTALL ENGINE UNDER COVER
- CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
- PERFORM INITIALIZATION
- Perform initialization (see
INITIALIZATION
).NOTE: Certain systems need to be initialized after disconnecting and reconnecting the cable from the negative (-) battery terminal.
- Perform initialization (see
INITIALIZATION
).