Oil Cooler Assembly: Installation
- INSTALL OIL NO.1 COOLER ASSEMBLY
- Install the air duct with the 3 bolts.
Torque: 4.9 N*m (50 kgf*cm, 43 in.*lbf)
- Install the oil cooler assembly with the 3 bolts.
Torque: 4.9 N*m (50 kgf*cm, 43 in.*lbf)
- Connect the 2 oil cooler hoses.
- Install the air duct with the 3 bolts.
- INSTALL FRONT BUMPER ASSEMBLY
(See INSTALLATION )
- ADD AND INSPECT HYBRID TRANSAXLE FLUID (See HYBRID TRANSAXLE FLUID )
- INSTALL ENGINE UNDER COVER NO.1 (See INSTALLATION )