Auxiliary Emission Control Systems: Canister: Inspection
- INSPECT CANISTER
- Visually check the canister for cracks or damage. If cracks or damage are found, replace the canister.
- Check the canister operation.
- With the purge port closed, blow 1.10 kPa (11.2 kgf/cm2 0.16 psi) of air into the vent port, and check that air flows from the air inlet port. If the result is not as specified, replace the canister.
- With the vent port closed, blow.1.10 kPa (11.2 kgf/cm2 0.16 psi) of air into the air inlet port, and check that air flows from the purge port. If the result is not as specified, replace the canister.
- Check for air leakage.
- With the purge port and air inlet port closed, apply 1.9.6 kPa (0.2 kgf/cm2 , 2.81 psi) of pressurized air into the vent port, then confirm that pressure is retained for 1 minute. If the result is not as specified, replace the charcoal canister assembly.
- Check the leak detection pump.
- Remove the detection pump from the charcoal canister.
- Check that air flows from port A to B and then to C.
If the result is not as specified, replace the charcoal canister.
- Connect the positive (+) lead of the battery to terminal 7 and the negative (-) lead to terminal 6.
- Check that the valve is closed.
If the result is not as specified, replace the canister.
- Install the detection pump.