Hood Lock Control Cable Assembly: Installation
HINT:
A bolt without a torque specification is shown in the standard bolt chart (see STANDARD BOLT ).
- INSTALL HOOD LOCK CONTROL CABLE ASSEMBLY
- Pass the cable into the engine room.
- Pass the cable rear side through the grommet until the cable stopper is attached to the grommet.
- Pass the cable front side through the upper radiator support.
- Connect the clamps as shown in the illustration.
- INSTALL HOOD LOCK CONTROL LEVER SUB-ASSEMBLY
- Install the hood lock lever and connect the hood lock control cable.
- Attach the 2 claws.
- INSTALL HOOD LOCK ASSEMBLY
- Apply MP grease to the sliding areas of the lock.
- Connect the hood lock control cable.
- Install the hood lock.
- Install the 2 bolts and nut.
Torque: 8.0 N*m (82 kgf*cm, 71 in.*lbf)
- Install a new cap.
- INSTALL FRONT FENDER PROTECTOR UPPER LH
- Attach the 3 clips to install the protector.
- INSTALL HOOD LOCK CONTROL CABLE COVER
- Attach the claw to install the cable cover.
- Install the 3 screws.
- INSTALL MILLIMETER WAVE RADAR SENSOR ASSEMBLY (See INSTALLATION )
- ADJUST MILLIMETER WAVE RADAR SENSOR ASSEMBLY (See ADJUSTMENT )
- INSTALL RADIATOR GRILLE ASSEMBLY (See INSTALLATION )
- INSTALL COOL AIR INTAKE DUCT SEAL (See INSTALLATION )
- INSTALL AIR CLEANER INLET COVER SUB-ASSEMBLY (See INSTALLATION )
- INSTALL ENGINE ROOM SIDE COVER RH (See INSTALLATION )
- INSTALL ENGINE ROOM SIDE COVER LH (See INSTALLATION )
- INSTALL COWL TOP VENTILATOR LOUVER RH (See INSTALLATION )
- PERFORM INITIALIZATION
- Perform initialization (see
INITIALIZATION
).NOTE: Certain systems need to be initialized after disconnecting and reconnecting the cable from the negative (-) battery terminal.
- Perform initialization (see
INITIALIZATION
).