Inspection Procedure
- CHECK HARNESS AND CONNECTOR
- Check the indication condition of the P/S warning light while by wiggling the power steering ECU assembly connector and wire harness up and down, and right and left.
OK:
P/S warning light indication condition does not change.
NG: REPAIR OR REPLACE HARNESS OR CONNECTOR
OK: Go to next step.
- Check the indication condition of the P/S warning light while by wiggling the power steering ECU assembly connector and wire harness up and down, and right and left.
- INSPECT CAN COMMUNICATION SYSTEM
- Using the intelligent tester, check for DTCs and confirm that there are no problems in the CAN communication system.
OK:
DTCs are not output.
NG: GO TO CAN COMMUNICATION SYSTEM
OK: Go to next step.
- Using the intelligent tester, check for DTCs and confirm that there are no problems in the CAN communication system.
- INSPECT MULTIPLEX COMMUNICATION SYSTEM (BEAN)
- Using the intelligent tester, check for DTCs and confirm that there are no problems in the multiplex communication system (BEAN).
OK:
DTCs are not output.
NG: GO TO MULTIPLEX COMMUNICATION SYSTEM (BEAN)
OK: Go to next step.
- Using the intelligent tester, check for DTCs and confirm that there are no problems in the multiplex communication system (BEAN).
- INSPECT FUSE (ECU-IG LH)
- Remove the ECU-IG LH fuse from the cowl side J/B LH.
- Check for continuity of the ECU-IG LH fuse.
OK:
Continuity
NG: REPLACE FUSE
OK: Go to next step
- INSPECT POWER STEERING ECU ASSEMBLY
- Disconnect the A23 connector from the power steering ECU assembly.
- Measure the voltage according to the value(s) in the table below.
Voltage
VOLTAGE SPECIFICATIONTester connection (Symbols) Condition Specified condition A23-9 (IG) - A23-5 (PGND) Engine switch on (IG) 10 to 14 V
Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
OK: Go to step 7
NG: Go to next step.
- CHECK HARNESS AND CONNECTOR (POWER STEERING ECU ASSEMBLY - BODY GROUND)
- Measure the resistance according to the value(s) in the table below.
Resistance
RESISTANCE SPECIFICATIONTester connection (Symbols) Condition Specified condition A23-5 (PGND) - Body ground Always Below 1 Ω
Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
NG: REPAIR OR REPLACE HARNESS OR CONNECTOR
OK: REPAIR OR REPLACE HARNESS OR CONNECTOR (POWER STEERING ECU ASSEMBLY -BATTERY)
- Measure the resistance according to the value(s) in the table below.
- REPLACE POWER STEERING ECU ASSEMBLY NOTE: If replacing the power steering ECU assembly, initialize the rotation angle sensor and calibrate the torque sensor zero point (see page CALIBRATION ).
- CHECK P/S WARNING LIGHT
- Check the P/S warning light status on the combination meter.
Standard:
The P/S warning light is off.
OK: END
NG: REPLACE PROCEED TO NEXT CIRCUIT INSPECTION SHOWN IN PROBLEM SYMPTOMS TABLE
- Check the P/S warning light status on the combination meter.