Section 12 (Starting (2GR-FSE)): Starter: Installation
WARNING: This page is about a different car, the 2007 Lexus GS 350. However, it is still accessible from the selected car via links, so may be relevant.
- INSTALL STARTER ASSEMBLY
- Install the starter with the 2 bolts.
Torque: 58 N*m (591 kgf*cm, 43 ft.*lbf)
- Connect the starter cable with the nut, and then attach the terminal cap.
Torque: 9.8 N*m (100 kgf*cm, 87 in.*lbf)
- Connect the starter connector.
- Install the starter with the 2 bolts.
- INSTALL EXHAUST MANIFOLD SUB-ASSEMBLY LH
- Install a new gasket.
- Install the exhaust manifold to the cylinder head with the 6 nuts in the order shown in the illustration.
Torque: 21 N*m (214 kgf*cm, 15 ft.*lbf)
NOTE: Do not damage the stud bolt when installing the exhaust manifold. - Connect the sensor connector.
- Install the engine wire bracket with the bolt.
Torque: 10 N*m (102 kgf*cm, 7 ft.*lbf)
- Install the ground cable with the 2 bolts.
Torque: 10 N*m (102 kgf*cm, 7 ft.*lbf) for Cylinder head
13 N*m (133 kgf*cm, 10 ft.*lbf) for Body
- INSTALL FRONT EXHAUST PIPE ASSEMBLY
- Install the front exhaust pipe (see INSTALLATION ).
- CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
- CHECK FOR EXHAUST GAS LEAKS (See INSTALLATION )
- INSTALL FRONT PROPELLER SHAFT ASSEMBLY (for 4WD) (See INSTALLATION )
- INSTALL REAR ENGINE UNDER COVER RH (for 2WD)
- INSTALL REAR ENGINE UNDER COVER LH (for 2WD)
- INSTALL NO. 2 ENGINE UNDER COVER (for 2WD) (See INSTALLATION )
- INSTALL ENGINE UNDER COVER (for 4WD)
- INSTALL ENGINE UNDER COVER (for 2WD)
- INSTALL FRONT SEAT ASSEMBLY LH (for 4WD)
- Install the front seat LH (see INSTALLATION ).
- INSTALL CONSOLE BOX (for 4WD) (See INSTALLATION )
- INSTALL CONSOLE BOX REGISTER ASSEMBLY (for 4WD) (See INSTALLATION )
- INSTALL CONSOLE BOX PLATE (See INSTALLATION )
- INSTALL INSTRUMENT PANEL FINISH PANEL END LH (See INSTALLATION )
- INSTALL INSTRUMENT PANEL FINISH PANEL END RH (See INSTALLATION )
- INSTALL CONSOLE UPPER PANEL ASSEMBLY (See INSTALLATION )
- INSTALL FRONT CONSOLE UPPER PANEL GARNISH (See INSTALLATION )
- CONNECT NO. 2 RELAY BLOCK
- Connect the No. 2 relay block with the bolt and nut.
Torque: 12 N*m (125 kgf*cm, 10 ft.*lbf)
- Connect the No. 2 relay block with the bolt and nut.
- INSTALL V-BANK COVER (See INSTALLATION )
- INSTALL ENGINE ROOM SIDE COVER RH (See INSTALLATION )
- INSTALL ENGINE ROOM SIDE COVER LH (See INSTALLATION )
- INSTALL COOL AIR INTAKE DUCT SEAL (See INSTALLATION )
- PERFORM INITIALIZATION
- Perform initialization (see
INITIALIZATION
).NOTE: Certain systems need to be initialized after disconnecting and reconnecting the cable from the negative (-) battery terminal.
- Perform initialization (see
INITIALIZATION
).