- INSTALL GENERATOR ASSEMBLY
- Install the generator with the bolt and 2 nuts.
HINT:
Install the bolt and 2 nuts in alphabetical order.
Torque: 39 N*m (398 kgf*cm, 29 ft.*lbf) for bolt A and nut B
15.5 N*m (158 kgf*cm, 11 ft.*lbf) for nut C
- Install the ground cable with bolt D.
- Install the battery cable with the nut, and then attach the rubber cap.
Torque: 12 N*m (122 kgf*cm, 9 ft.*lbf)
- Install the bracket with the bolt.
Torque: 6.0 N*m (61 kgf*cm, 53 in.*lbf)
- Connect the cable to the generator.
- Install the generator with the bolt and 2 nuts.
- INSTALL V-RIBBED BELT (See INSTALLATION )
- INSTALL AIR CLEANER ASSEMBLY WITH INTAKE AIR CONNECTOR PIPE (See INSTALLATION )
- INSTALL AIR CLEANER INLET
- Install the inlet with the bolt.
Torque: 5.0 N*m (51 kgf*cm, 44 in.*lbf)
- Install the inlet with the bolt.
- INSTALL ENGINE ROOM COVER SIDE RH (See INSTALLATION )
- INSTALL COOL AIR INTAKE DUCT SEAL (See INSTALLATION )
- INSTALL ENGINE UNDER COVER (See INSTALLATION )
- INSTALL V-BANK COVER SUB-ASSEMBLY
- Install the cover with the 2 nuts.
Torque: 5.0 N*m (51 kgf*cm, 44 in.*lbf)
- Install the cover with the 2 nuts.
- CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
- PERFORM INITIALIZATION
- Perform initialization (see