Power Steering Link: Inspection
- INSPECT POWER STEERING RACK
- Using a dial indicator, check for teeth wear and runout of the steering rack.
Maximum runout:
0.3 mm (0.0118 in.)
NOTE: Make sure that the steering rack is placed horizontally.If runout exceeds the maximum, replace the power steering link assembly.
- Check the rack surface for wear and damage.
- Using a dial indicator, check for teeth wear and runout of the steering rack.
- INSPECT TIE ROD ASSEMBLY LH
- Secure the tie rod end assembly LH in a vise.
- Install the nut to the stud bolt.
- Flip the ball joint back and forth 5 times or more.
- Using a torque wrench, turn the nut continuously at a rate of 3 to 5 seconds per turn and take the torque reading on the 5th turn.
Torque: Turning torque
0.98 to 3.92 N*m (10 to 40 kgf*cm, 8.7 to 34.7 in.*lbf)
If turning torque is not within the specified range, replace the tie rod assembly LH.
- INSPECT TIE ROD ASSEMBLY RH
HINT:
Perform the same procedure as for the LH side.
- INSPECT TOTAL PRELOAD
- Temporarily install the 2 steering rack ends to the power steering rack.NOTE: Do not fully turn the power steering rack without the steering rack ends as it may damage the oil seal in the rack housing.
- Using SST, fully turn the power steering rack right and left 10 times to settle it.
SST 09616-00011
- Using SST, turn the control valve and measure the preload.
SST 09616-00011
Torque: Standard preload (turning)
1.5 N*m (15.3 kgf*cm, 13.3 in.*lbf) or less
If the preload exceeds the specified value, go back to INSTALL RACK GUIDE (INSTALLATION ).
- Remove the 2 steering rack ends from the power steering rack.
- Temporarily install the 2 steering rack ends to the power steering rack.