Compressor And Magnetic Clutch: Installation
- TEMPORARILY TIGHTEN COMPRESSOR AND MAGNETIC CLUTCH
- Temporarily install the compressor and magnetic clutch onto the bolt.
- FULLY TIGHTEN COMPRESSOR AND MAGNETIC CLUTCH
- Install the compressor and magnetic clutch with the 4 bolts.
Torque: 25 N*m (255 kgf*cm, 18 ft.*lbf)
NOTE: Tighten the bolts in the order shown in the illustration to install the compressor and magnetic clutch.
- Install the compressor and magnetic clutch with the 4 bolts.
- INSTALL NO. 1 COOLER REFRIGERANT SUCTION HOSE
- Remove the attached vinyl tape from the hose.
- Apply sufficient compressor oil to a new O-ring and the fitting surface of the compressor and magnetic clutch.
Compressor oil: ND-OIL 8 or equivalent
- Install the O-ring onto the No. 1 cooler refrigerant suction hose.
- Install the No. 1 cooler refrigerant suction hose onto the compressor and magnetic clutch with the bolt.
Torque: 9.8 N*m (100 kgf*cm, 87 in.*lbf)
- INSTALL NO. 1 COOLER REFRIGERANT DISCHARGE HOSE
- Remove the attached vinyl tape from the hose.
- Apply sufficient compressor oil to a new O-ring and the fitting surface of the compressor and magnetic clutch.
Compressor oil: ND-OIL 8 or equivalent
- Install the O-ring onto the No. 1 cooler refrigerant discharge hose sub-assembly.
- Install the No. 1 cooler refrigerant discharge hose onto the compressor and magnetic clutch with the bolt.
Torque: 9.8 N*m (100 kgf*cm, 87 in.*lbf)
- INSTALL GENERATOR ASSEMBLY (See INSTALLATION )
- INSTALL V-RIBBED BELT (See INSTALLATION )
- INSTALL RADIATOR ASSEMBLY (See INSTALLATION )
- INSTALL FAN SHROUD (See INSTALLATION )
- INSTALL RADIATOR SUPPORT UPPER (See INSTALLATION )
- CONNECT NO. 1 OIL COOLER OUTLET TUBE (See INSTALLATION )
- CONNECT NO. 1 OIL COOLER INLET TUBE (See INSTALLATION )
- CONNECT RADIATOR HOSE OUTLET (See INSTALLATION )
- CONNECT RADIATOR HOSE INLET (See INSTALLATION )
- CONNECT RADIATOR RESERVOIR TANK HOSE (See INSTALLATION )
- INSTALL MILLIMETER WAVE RADAR SENSOR ASSEMBLY (w/ Dynamic Radar Cruise Control System) (See INSTALLATION )
- INSTALL FRONT BUMPER ENERGY ABSORBER
- INSTALL FRONT BUMPER ASSEMBLY (See INSTALLATION )
- INSTALL NO. 1 AIR CLEANER INLET (See INSTALLATION )
- INSTALL NO. 2 AIR CLEANER INLET (See INSTALLATION )
- INSTALL AIR CLEANER CAP SUB-ASSEMBLY (See INSTALLATION )
- CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
- ADD ENGINE COOLANT (See ON-VEHICLE INSPECTION )
- CHECK FOR ENGINE COOLANT LEAKS (See COOLING SYSTEM )
- CHARGE WITH REFRIGERANT (See REPLACEMENT )
- WARM UP COMPRESSOR (See REPLACEMENT )
- CHECK FOR REFRIGERANT LEAKS (See REPLACEMENT )
- PERFORM INITIALIZATION NOTE: Some systems need initialization after reconnecting the negative battery terminal (See INITIALIZATION ).
- INSTALL COOL AIR INTAKE DUCT SEAL (See INSTALLATION )
- INSTALL ENGINE ROOM SIDE COVER LH (See INSTALLATION )
- INSTALL ENGINE ROOM SIDE COVER RH (See INSTALLATION )
- INSTALL V-BANK COVER SUB-ASSEMBLY (See INSTALLATION )
- INSTALL ENGINE UNDER COVER LH
- INSTALL ENGINE UNDER COVER RH
- INSTALL FRONT WHEEL OPENING EXTENSION PAD LH
- INSTALL FRONT WHEEL OPENING EXTENSION PAD RH
- ADJUST MILLIMETER WAVE RADAR SENSOR (See ADJUSTMENT )
- VEHICLE PREPARATION FOR FOG LIGHT AIM ADJUSTMENT (See ADJUSTMENT )
- PREPARATION FOR FOG LIGHT AIMING (See ADJUSTMENT )
- FOG LIGHT AIMING INSPECTION (See ADJUSTMENT )
- FOG LIGHT AIMING ADJUSTMENT (See REASSEMBLY )