VACUUM SWITCHING VALVE (for EVAP): Installation
- INSTALL NO. 1 VACUUM SWITCHING VALVE
- Install the No. 1 vacuum switching valve with the bolt.
Torque: 10 N*m (102 kgf*cm, 7 ft.*lbf)
- Disconnect the 2 vacuum hoses and No. 1 vacuum switching valve connector.
- Install the No. 1 vacuum switching valve with the bolt.
- INSTALL V-BANK COVER SUB-ASSEMBLY (See INSTALLATION )