Emission Control: Canister: Inspection
- INSPECT CHARCOAL CANISTER ASSEMBLY
- Visually check the charcoal canister for cracks or damage.
If cracks or damage are found, replace the charcoal canister assembly.
- Check charcoal canister operation.
- With the purge port closed, blow 1.67 kPa (17.0 gf/cm2 , 0.24 psi) of air into the vent port, and check that air flows from the air inlet port. If the result is not as specified, replace the charcoal canister assembly.
- With the vent port closed, blow 1.10 kPa (11.2 gf/cm2 , 0.16 psi) of air to the air inlet port, and check that air flows from the purge port. If the result is not as specified, replace the charcoal canister assembly.
- Check for air leakage.
- Remove the air hose between ports A and B.
- Connect the SST (pressure gauge) to the vent port of the charcoal canister.
SST 09992-00242
- While holding port B, with the purge port and the air inlet port closed and port A open, apply 19.6 kPa (0.2 kgf/cm2 , 2.81 psi) of pressurized air into the vent port, then confirm that pressure is retained for 1 minute. If the result is not as specified, replace the charcoal canister assembly.
- Check the leak detection pump.
- Remove the detection pump from the charcoal canister.
- Check that air flows from port A to B and then C.
If the result is not as specified, replace the charcoal canister assembly.
- Connect the positive (+) lead to terminal 7 and the negative (-) lead to terminal 6.
- Check that the valve is closed.
If the result is not as specified, replace the charcoal canister assembly.
- Install the detection pump.
- Visually check the charcoal canister for cracks or damage.