No. 2 Power Point Socket: Installation
- INSTALL NO. 2 POWER POINT SOCKET
- Engage the 2 claws and install the No.2 power point socket.
- INSTALL ROOF SIDE GARNISH ASSEMBLY INNER RH
- INSTALL NO. 1 TONNEAU COVER HOLDER CAP
- INSTALL NO. 2 ROOM LIGHT ASSEMBLY
- INSTALL DECK TRIM SIDE PANEL ASSEMBLY RH
- INSTALL ROPE HOOK
- INSTALL REAR SEAT SIDE COVER RH
- INSTALL REAR NO. 1 SEAT OUTER BELT ASSEMBLY RH
- Install the rear No. 1 seat outer belt assembly RH with the bolt.
Torque: 42 N*m (428 kgf*cm, 31 ft.*lbf)
- Install the rear No. 1 seat outer belt assembly RH with the bolt.
- INSTALL REAR FLOOR FINISH SIDE PLATE RH
- INSTALL REAR FLOOR FINISH PLATE
- INSTALL DECK SIDE TRIM COVER RH
- INSTALL DECK SIDE TRIM BOX LH
- INSTALL DECK SIDE TRIM BOX RH
- INSTALL BACK DOOR WEATHERSTRIP
- INSTALL NO.3 DECK BOARD SUB-ASSEMBLY
- INSTALL NO.2 DECK BOARD SUB-ASSEMBLY
- INSTALL DECK FLOOR BOX REAR
- INSTALL DECK FLOOR BOX FRONT
- INSTALL JACK CARRIER ASSEMBLY
- INSTALL JACK ASSEMBLY
- INSTALL JACK CARRIER SUPPORT
- INSTALL TONNEAU COVER ASSEMBLY
- INSTALL DECK BOARD SUB-ASSEMBLY
- INSTALL REAR DOOR OPENING TRIM WEATHERSTRIP RH
- INSTALL REAR DOOR SCUFF PLATE RH