Throttle W/Motor Body ASSY (2UZ-FE): Replacement
- DRAIN ENGINE COOLANT. See COOLANT (2UZ-FE) (FROM AUGUST, 2003)
.
- REMOVE V-BANK COVER SUB-ASSY
- Remove the 2 cap nuts and V-bank cover sub-assy.
- REMOVE AIR CLEANER HOSE ASSY
- Disconnect the vacuum hoses (For P/S idle-up and for fuel pressure regulator) and ventilation hose.
- Remove the air cleaner hose assy.
- REMOVE THROTTLE W/MOTOR BODY ASSY
- Disconnect the water by-pass hose, water by-pass hose No. 7 and the throttle position sensor connector.
- Remove the 2 bolts and 2 nuts.
- Remove the throttle body and the throttle body gasket.
- INSTALL THROTTLE W/MOTOR BODY ASSY
- Install the new gasket and throttle body with the 2 bolts and 2 nuts.
- Torque: 18 N.m (185 kgf. cm, 13 ft. lb)
- Connect the water by-pass hose, water by-pass hose No. 7 and throttle position sensor connector.
- INSTALL AIR CLEANER HOSE ASSY
- ADD ENGINE COOLANT. See COOLANT (2UZ-FE) (FROM AUGUST, 2003)
.
- CHECK FOR ENGINE COOLANT LEAKS. See COOLANT (2UZ-FE) (FROM AUGUST, 2003)
.
- INSTALL V-BANK COVER SUB-ASSY
- Install the V-bank cover sub-assy with 2 cap nuts.
- Torque: 7.5 N.m (80 kgf. cm, 66 in. lb)