Propeller Shaft: Installation
- INSTALL PROPELLER SHAFT
- Apply grease to the flexible coupling centering bushings.
Grease:
Molybdenum disulphide lithium base, NLGI No. 2
- Install the propeller shaft from the vehicle's rear and connect the transmission and differential.NOTE: Support the center support bearing by hand so that the transmission and intermediate shaft, and propeller shaft and differential, remain in a straight line.
- Temporarily install the 2 center support bearing set bolts with the adjusting washers.
Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
HINT:
Use the adjusting washers which were removed.
- Align the matchmarks and connect the propeller shaft to the transmission/differential.
- Install and torque the 3 bolts, washers and nuts.NOTE: The bolts should be installed from the propeller shaft side.
Torque: 79 N.m (805 kgf.cm, 58 ft.lbf)
- If using a new propeller shaft (w/Phase Marks):
Install the propeller shaft phase marks and differential/ transmission phase marks so that their respective alignment phase marks match.
If the propeller shaft phase marks and differential/transmission phase marks do not align, install the propeller shaft and differential alignment phase marks as close together as possible.
- If using a new propeller shaft (w/o Phase Marks):
Install the propeller shaft.
- Torque the 2 center support bearing set bolts.
Torque: 37 N.m (375 kgf.cm, 27 ft.lbf)
HINT:
Adjust the center support bearing to keep the intervals as shown in Fig 5 with the vehicle in the unladen condition.
Under the same condition, check if the center line of the center support bearing is at right angles to the shaft axial direction.
- Using SST, tighten the adjusting nut.
SST 09922-10010
Torque: 50 N.m (515 kgf.cm, 37 ft.lbf)
HINT:
Use a torque wrench with a fulcrum length of 34.5 cm (13.6 in.).
- Apply grease to the flexible coupling centering bushings.
- INSPECT JOINT ANGLE (See INSPECTION ) NOTE: The joint angle should by all means be checked when the propeller shaft is removed and installed.
- INSTALL 2 HEAT INSULATORS
- Install the heat insulator and torque the 4 bolts.
Torque: 5.4 N.m (55 kgf.cm, 48 in.lbf)
- Install the heat insulator and torque the 6 bolts.
Torque: 5.4 N.m (55 kgf.cm, 48 in.lbf)
- Install the heat insulator and torque the 4 bolts.
- INSTALL EXHAUST PIPE ASSEMBLY
- Connect the exhaust pipe assembly to the O-rings.
- For 2JZ-GE Engine:
Install the 3 bolts, nuts and 2 gaskets to the exhaust manifold. Torque the bolts.
Torque: 44 N.m (450 kgf.cm, 33 ft.lbf)
- For 3UZ-FE Engine:
Install the 4 bolts, nuts and 2 gaskets to the exhaust manifold. Torque the bolts.
Torque: 44 N.m (450 kgf.cm, 33 ft.lbf)
- Install the front floor center brace and torque the 2 bolts.
Torque: 7.4 N.m (75 kgf.cm, 65 in.lbf)
- Connect the heated oxygen sensor.
Torque: 44 N.m (450 kgf.cm, 33 ft.lbf)
HINT:
- Before installing the oxygen sensor, twist the sensor wire counterclockwise 3 and 1/2 turns.
- After installing oxygen sensor, check that the sensor wire should not twist. If it is twisted, remove the oxygen sensor and reinstall it.