Vacuum Switching Valve Assembly No. 1 (ES300)
Using an ohmmeter, ensure 33-39 ohms are present between vacuum switching valve assembly No. 1 terminals at 68°F (20°C). Check that air flows from port "B" to filter. Apply battery voltage across terminals. Check that air flows from port "B" to port "A". See Fig 1.