Removal & Installation
- Disconnect negative battery cable. Drain cooling system. Disconnect accelerator cable and A/T throttle cable. Remove air cleaner assembly. Remove "V" bank cover. See Figure. Disconnect power steering hose from No. 1 engine hanger.
- Remove PCV hose and valve from right cylinder head. Disconnect ground cable from air intake chamber. Remove brake booster vacuum hose from air intake chamber. Disconnect water by-pass hoses from throttle body.
- Remove air assist hose from throttle body. Disconnect EVAP hose from pipe on emission control valve set. Note location for installation reference and disconnect wiring harness connectors as necessary.
- Remove Data Link Connector No. 1 (DLC1) from bracket on Intake Air Control (IAC) valve. Remove No. 1 engine hanger. Remove air intake chamber stay. Remove No. 2 EGR pipe and gaskets. Label and disconnect vacuum hoses as necessary. Remove air intake chamber assembly and gasket.
- Disconnect fuel return hose from fuel pressure regulator. Disconnect fuel inlet hose from fuel filter. Remove 2 banjo bolts, 4 gaskets and fuel pipe. Remove fuel rails and injectors as an assembly. Pull injectors from fuel rail using a slight twisting motion.