Transfer Case Control Module (G2469183): Installation
-
- Install the TCCM .
- Install and tighten the 2 bolts.
Torque : 18Nm
- Connect the electrical connector.
-
NOTE: If equipped.
- Install the heatshield.
- Install and tighten the 3 bolts.
Torque : 8Nm
- Connect the startup battery ground cable.
Refer to: SPECIFICATIONS .
-
- Connect the Jaguar Land Rover (JLR) approved diagnostic equipment.
- Start the diagnostic service function "transfer case-transfer case control module replacement".
- Clear any Diagnostic Trouble Code(s) (DTC) after calibration and check for correct operation.