88.20.01 Instrument Panel - Up To 04MY: Refit
- Position instrument panel and connect multiplugs.
- Fit instrument panel to fascia and secure with screws.
- Fit instrument panel upper cover and secure with screws.
- Fit instrument cowl.
- Connect battery leads, earth lead last.
- Using T4 scan tool, download stored information to a new instrument panel.