Ground Circuit Inspection
- Ignition "OFF".
- Disconnect Battery (-) terminal.
- Refer to RAIL PRESSURE SENSOR (RPS) and disconnect Fuel Rail Pressure Sensor (RPS) joint connector.
- Measure resistance between Pin No. 11 (Ground) terminal of Fuel Rail Pressure Sensor (RPS) joint connector and chassis ground.
Specification: Approx. below 1Ω
- Is measured value within specification?
YES
- Go to "Signal Circuit Inspection" procedure below.
NO
- Repair open or short in ground circuit of Fuel Rail Pressure Sensor (RPS) and then go to "VERIFICATION OF VEHICLE REPAIR " procedure.