Ground Circuit Inspection
- Ignition "OFF" and disconnect A/C pressure transducer connector.
- Ignition "ON".
- Measure voltage between Pin No. 3 (Power) terminal of A/C pressure transducer harness connector and chassis ground. (A)
- Measure voltage between Pin No. 3 (Power) terminal and Pin No. 1 (Ground) terminal of the A/C pressure transducer. (B)
Specification: "A" - "B" = 200mV below
- Is the measured voltage within specification?
YES
- Go to "Signal Circuit Inspection" procedure below.
NO
- Repair or replace as necessary and then, go to "VERIFICATION OF VEHICLE REPAIR " procedure.