Control Circuit Inspection
- Check the fuel pump fuse (15A)
- Ignition "OFF" and disconnect fuel pump connector.
- Measure voltage between Pin No. 10 (Motor +) terminal of fuel pump harness connector and chassis ground (Measure the control circuit while turn the Ignition switch "OFF" to "ON").
Specification: 0V -> 12V -> 0V (Fuel pump is controlled for 7 to 8s. by the ECM/PCM)
- Is the measured voltage within specification?
YES
- go to "Component Inspection " procedure.
NO
- Repair as necessary and go to "VERIFICATION OF VEHICLE REPAIR " procedure.