Fuel Sender (+) Input Inspection
- Ignition "OFF" & Disconnect FPCM connector.
- Ignition "ON".
- Measure voltage between Pin No. 6 (+) terminal of FPCM harness connector and chassis ground.
Specification: Approx. 11V
- Is the measured voltage within specification?
YES
- Go to "COMPONENT INSPECTION " procedure.
NO
- Repair or replace as necessary and then, go to "Verification Of REPAIR " procedure.