Signal Circuit Inspection
- Ignition "OFF" & Disconnect CMPS-IN (Bank 2) connector.
- Ignition "ON".
- Measure voltage between Pin No. 2 (Signal) terminal of CMPS-IN (Bank 2) harness connector and chassis ground.
Specification: Approx. 4.9V
- Is the measured voltage within specification?
YES
- Go to "GROUND CIRCUIT INSPECTION " procedure.
NO
- Repair or replace as necessary and then, go to "Verification Of REPAIR " procedure.