Component Inspection
- Perform OCV Actuation Test
- Connect GDS to Data Link Connector (DLC).
- IG KEY "ON" & ENG "OFF".
- Perform "Actuation Test " for OCV.
- Inspect OCV
- IG Key "OFF".
- Disconnect OCV connector.
- Measure resistance between Pin No. 2 (Power) terminal and Pin No. 1 (Control) terminal of the OCV#1. (Component Side)
Specification: Approx. 10Ω at 30°C (86 °F)
- Confirm Part Inspection
- Does the OCV operate properly and is the measured resistance within specification? (Check variation)
YES
- Go to "VERIFICATION OF VEHICLE REPAIR " procedure.
NO
- Carefully re-do this troubleshooting guide steps.
- If problem still occurs, replace OCV and then go to "VERIFICATION OF VEHICLE REPAIR " procedure.
- Does the OCV operate properly and is the measured resistance within specification? (Check variation)