Failure Checkup
- Initial checkup is performed immediately after the HECU power on.
- Valve relay checkup is performed immediately after the IG2 ON.
- It executes the checkup all the time while the IG2 power is on.
- Initial checkup is made in the following cases.
- When no failure is detected
- When ABS and ESC are not in control.
- Initial checkup is not made after ECU power on.
- If the vehicle speed is over 8 km/h (5 mph) when the brake lamp switch is off.
- When the vehicle speed is over 40 km/h (24.9 mph).
- Though, it keeps on checkup even if the brake lamp switch is on.
- When performing ABS or ESC control before the initial checkup, stop the initial checkup and wait for the HECU power input again.
- Judge failure in the following cases.
- When the power is normal.
- From the point in which the vehicle speed reaches 8 km/h (5.0 mph) after HECU power on.