LEMON Manuals: Even more car manuals for everyone
Home >> Kia >> 2009 >> Optima EX, 2.4 8 >> Repair and Diagnosis >> Electrical >> Charging Systems >> Charging System >> Repair Procedures >> On-vehicle Inspection >> Inspect Charging System >> Preparation >> Notes

Inspect Charging System: Preparation: Notes

  1. Turn the ignition switch to "OFF".
  2. Disconnect the output wire from the alternator "B" terminal. Connect the (+) lead wire of ammeter to the "B" terminal of alternator and the (-) lead wire of ammeter to the output wire. Connect the (+) lead wire of voltmeter to the "B" terminal of alternator and the (-) lead wire of voltmeter to the (+) terminal of battery.
Fig 1: Connecting Lead Wire Of Ammeter To "B" Terminal Of Alternator
G06366029Courtesy of KIA MOTORS AMERICA, INC.