Speed Sensor: Notes
- Connect voltmeter between TCM terminal C221/16 and ground.
- Turn ignition on, remove speedometer cable from transmission and turn speedometer cable one turn. There should be about 3.5 volts, indicated 4 times in one revolution. See appropriate control unit connector in CONTROL UNIT CONNECTORS & TERMINAL VOLTAGE CHARTS.
NOTE:
See AIR BAG caution at beginning of article.