Removal And Installation: 2.4L: Installation
- Check that the battery tray is not damaged.
- If removed, position the PCM to the battery tray, then install and tighten the nuts to the proper torque specifications. Refer to TECHNICAL SPECIFICATIONS .
- Attach the washer fluid assembly to the battery tray.
- Position the battery tray to the vehicle, then install and tighten the screws to the proper torque specifications. Refer to TECHNICAL SPECIFICATIONS .
- Connect the PCM wire harness connectors and ground strap to the PCM. Install and securely tighten the ground strap nut.
- Install the main and supplemental batteries to the battery tray. Refer to BATTERY, REMOVAL AND INSTALLATION or BATTERY, SUPPLEMENTAL, REMOVAL AND INSTALLATION .