LEMON Manuals: Even more car manuals for everyone
Home >> Jeep >> 2021 >> Cherokee High Altitude, Full Time T/Case Control >> Repair and Diagnosis >> Accessories & Equipment >> Warning Systems >> Chime/Buzzer/Driver Assist (Service Information) >> Module, Park Assist >> Installation

Module, Park Assist: Installation

GC0160126Courtesy of CHRYSLER GROUP, LLC
  1. Position the Park Assist Module (PAM) (3) onto the weld studs on the left quarter inner panel (1) just behind the left rear wheel house.
  2. Install and securely tighten the fasteners (2) that secure the PAM to the weld studs.
  3. Connect the wire harness connectors (4) to the PAM connector receptacles.
  4. Install the quarter trim panel to the left quarter inner panel. Refer to PANEL, QUARTER TRIM, INSTALLATION .
  5. Connect the negative battery cable. If equipped with an Intelligent Battery Sensor (IBS), connect the IBS connector.
NOTE:

If this Electronic Control Unit (ECU) is being replaced with a new unit, a diagnostic scan tool MUST be used to align the PROXI configuration data into the new ECU. Follow the routine outlined in the diagnostic scan tool for PROXI Configuration Alignment under Body Control Module (BCM) Miscellaneous Functions menu.