Charging System (Service Information): Generator: Installation: 3.6L
- Install the generator into the vehicle.
- Install the three mounting retainers.
Tighten to 25 N.m (18 Ft. Lbs.).
- Install ground wire on mounting stud (4).
- Install the lower front ground wire mounting nut (5).
Tighten to 24 N.m (18 Ft. Lbs)
- Install the serpentine belt. Refer to BELT, SERPENTINE, INSTALLATION
.
- Install the B+ terminal to the generator stud.
Tighten to 17 N.m (150 In. Lbs.).
- Plug in the field circuit to the generator.
- Connect the negative battery cable.