LEMON Manuals: Even more car manuals for everyone
Home >> Jeep >> 2018 >> Wrangler Rubicon, 2.0L Eng VIN N >> Labor Times >> Transmission >> Automatic Trans >> Transmission Assembly >> Removal & Installation

Removal & Installation

8 SPEED TRANS

Applies ToNoteStandard HoursWarranty HoursSkill Level
2.0L Eng,Gas/Electric,Automatic TransIncludes: Check and adjust Transmission Fluid level with fluid temperature within parameters. Includes: Disable and Enable High Voltage System.7.4C
Combination Procedure: CRANKSHAFT MAIN OIL SEAL: Remove & Replace:
2.0L Eng, Rear,Seal0.5B
2.0L Eng, Rear,Seal and Retainer0.8B
Combination Procedure: FLYWHEEL: Remove & Replace:
0.3C
Combination Procedure: OUTPUT SHAFT SEAL: Replace:
0.2B
Combination Procedure: TORQUE CONVERTER: Remove & Replace:
0.5C
Combination Procedure: TORQUE CONVERTER SEAL: Remove & Replace:
0.6B
Combination Procedure: TRANSMISSION ASSEMBLY: Replace:
Includes: Programming.0.8C
Combination Procedure: TRANSMISSION OIL PUMP: Remove & Replace:
Includes: R&I Valve Body Assembly.2.7B