LEMON Manuals: Even more car manuals for everyone
Home >> Jeep >> 2018 >> Grand Cherokee Trackhawk >> Repair and Diagnosis >> External Pages >> Different variant/trim >> Section 12 (6.4L Engine (Service Information)) >> Lubrication >> Control Valve, Oil Intake >> Installation

Control Valve, Oil Intake: Installation

WARNING: This page is about a different variant/trim than selected.
GC0088106Courtesy of CHRYSLER GROUP, LLC
  1. Lubricate the Variable Valve Timing Solenoid (VVTS) rubber O-ring seal with clean engine oil.
  2. Install the VVTS and rotate into position.
    GC0144407Courtesy of CHRYSLER GROUP, LLC
  3. Install the VVTS (3) retaining bolt (2) and tighten to the proper specifications. Refer to TORQUE SPECIFICATIONS  .
  4. Connect VVTS electrical connector (1).
  5. Install intake manifold. Refer to INTAKE MANIFOLD INSTALLATION .