LEMON Manuals: Even more car manuals for everyone
Home >> Jeep >> 2017 >> Cherokee Trailhawk, 3.2L Eng VIN S >> Repair and Diagnosis >> Transmission >> Automatic Trans >> Engine Cooling System >> Engine >> Radiator, Engine Cooling >> Installation >> 3.2L

Radiator, Engine Cooling: Installation: 3.2L

GC0160159Courtesy of CHRYSLER GROUP, LLC
  1. If removed, install the cooling fan onto the radiator. Tighten to bolts (1) to 9 N.m (80 in. lbs.).
  2. If removed, install the upper radiator hose (2) onto the radiator and secure the clamp.
    GC0159435Courtesy of CHRYSLER GROUP, LLC
  3. Position the radiator into the lower mounting (1) isolators on the radiator lower support.
    GC0159391Courtesy of CHRYSLER GROUP, LLC
  4. Install the condenser to the radiator (1). Tighten the bolts (2) to 8 N.m (70 in. lbs.).
    GC0159379Courtesy of CHRYSLER GROUP, LLC
  5. Install and securely tighten the transmission cooler line support brace bolt (1).
    GC0159561Courtesy of CHRYSLER GROUP, LLC
  6. Connect the wire harness connector to the A/C pressure switch.
  7. Install the A/C fill port support bracket (2) and securely tighten the fastener.
    GC0159343Courtesy of CHRYSLER GROUP, LLC
  8. Install the upper radiator mounts (1) and tighten bolts to 9 N.m (80 in. lbs.).
  9. Install the upper radiator hose onto the upper coolant cross over pipe and secure the clamp.
    GC0159459Courtesy of CHRYSLER GROUP, LLC
  10. Install the upper radiator close out panel (1) and securely tighten the fasteners.
  11. Install the wiring harness (7) to the air deflector.
  12. Install the hood release cable (3) to the air deflector.
  13. Connect the horn wire harness connectors (6).
  14. Connect the cooling fan wire harness connector (4).
  15. Connect the ambient air temperature sensor wire harness connector (5).
    GC0160015Courtesy of CHRYSLER GROUP, LLC
  16. Install the side air deflectors (2) onto the upper radiator closeout panel (1).
  17. Install the hood latch. Refer to LATCH, HOOD, INSTALLATION .
  18. Install the lower radiator hose.
  19. Fill the cooling system. Refer to STANDARD PROCEDURE .
  20. Connect the negative battery cable. If equipped with an Intelligent Battery Sensor (IBS), connect the IBS connector.
  21. Install the engine cover.