2.4L Multi Air: Installation
Courtesy of CHRYSLER GROUP, LLC
- Install the cooling fan (1b) and engage the retaining brackets (1a).
Courtesy of CHRYSLER GROUP, LLC
- Attach the cooler lines to the retainer and close the retainer (2b).
- Attach the wire harness retainer (1c) from fan shroud.
- Connect the cooling fan wire harness connector (1b).
- Connect the resistor wire harness connector (1a).
Courtesy of CHRYSLER GROUP, LLC
- Install the pressurized coolant bottle (1b) and the fasteners (1a).
Courtesy of CHRYSLER GROUP, LLC
- Remove the plugs from the cooler lines an cooler.
- Connect the transmission oil cooler line (1b) and the retaining clips (1a).
Courtesy of CHRYSLER GROUP, LLC
- Install he exhaust heat shield (1c) and securely tighten the nuts (1b) and bolts (1a).
- Connect the negative battery cable.