LEMON Manuals: Even more car manuals for everyone
Home >> Jeep >> 2016 >> Grand Cherokee SRT >> Repair and Diagnosis (Single Page) >> Accessories & Equipment >> Communication Devices >> Electronic Control Modules (Service Information) >> Module, Active Damping Control >> Installation >> Installation

Module, Active Damping Control: Installation: Installation

Fig 1: Air Suspension Control, Blind Spot & Drive Train Control Modules
GC0145747Courtesy of CHRYSLER GROUP, LLC
  1. Slide the Active Damping Control Module (ADCM) (2) into position making sure the latches secure the ADCM.
  2. Connect the wire harness connectors to the ADCM (2).
  3. From behind/under the LF seat, install the cover panel on the electronic module tub (4).
  4. Connect the negative battery cable. Refer to CABLES, BATTERY, INSTALLATION .
  5. Perform the ADCM Verification Test.