LEMON Manuals: Even more car manuals for everyone
Home >> Jeep >> 2015 >> Cherokee Sport, Eng CD ED8, AWD >> Repair and Diagnosis >> Transmission >> Automatic Trans >> Engine Cooling System >> Engine >> Sensor, Coolant Temperature >> Removal >> 2.2L Diesel

2.2L Diesel

  1. Disconnect and isolate the negative battery cable. If equipped with an Intelligent Battery Sensor (IBS), disconnect the IBS connector first before disconnecting the negative battery cable.
  2. Remove the engine cover. Refer to
  3. Remove the belly pan. Refer to BELLY PAN, REMOVAL .
  4. Drain the cooling system. Refer to STANDARD PROCEDURE .
    Fig 1: Engine Cooling Temperature (ECT) Sensor & Clip
    GC0162262Courtesy of CHRYSLER GROUP, LLC
  5. Remove the clip and the Engine Cooling Temperature (ECT) sensor (1) from the thermostat housing.
    Fig 2: (ECT) Sensor Wire Harness Connector
    GC0162349Courtesy of CHRYSLER GROUP, LLC
  6. Disconnect the (ECT) sensor wire harness connector (1).