LEMON Manuals: Even more car manuals for everyone
Home >> Jeep >> 2014 >> Compass Limited, AWD, Automatic Trans >> Repair and Diagnosis >> External Pages >> Different car >> Section 26 (Charging System (Service Information)) >> Diagnosis and Testing >> Charging System >> Inspection

Charging System: Inspection

WARNING: This page is about a different car, the 2009 Jeep Liberty. However, it is still accessible from the selected car via links, so may be relevant.

The Powertrain Control Module (PCM) monitors critical input and output circuits of the charging system, making sure they are operational. A Diagnostic Trouble Code (DTC) is assigned to each input and output circuit monitored by the On-Board Diagnostic (OBD) system. Some charging system circuits are checked continuously, and some are checked only under certain conditions.

To perform a complete test of the charging system, use a diagnostic scan tool. Perform the following inspections before attaching the scan tool.

  1. Inspect the battery condition. Refer toBATTERY for procedures.
  2. Inspect condition of battery cable terminals, battery posts, connections at engine block, starter solenoid and relay. They should be clean and tight. Repair as required.
  3. Inspect all fuses in both the fuseblock and Power Distribution Center (PDC) for tightness in receptacles. They should be properly installed and tight. Repair or replace as required.
  4. Inspect generator mounting bolts for tightness. Replace or tighten bolts if required. Refer toTORQUE - GENERATOR  for torque specifications.
  5. Inspect generator drive belt condition and tension. Tighten or replace belt as required. Refer to COOLING Cooling System.
  6. Inspect automatic belt tensioner (if equipped). Refer toCOOLING for information.
  7. Inspect generator electrical connections at generator field, battery output, and ground terminal (if equipped). Also check generator ground wire connection at engine (if equipped). They should all be clean and tight. Repair as required.