LEMON Manuals: Even more car manuals for everyone
Home >> Jeep >> 2012 >> Wrangler Sport, Standard Trans >> Repair and Diagnosis >> External Pages >> Different variant/trim >> Section 4 (Transmission Control Module (TCM) - Electrical Diagnostics) >> Standard Procedure >> Nag1 Transmission Verification Test >> Road Test Procedure

Road Test Procedure

WARNING: This page is about a different variant/trim than selected.
  1. Road test the vehicle. Make fifteen to twenty 1-2, 2-3, 3-4, and 4-5 upshifts.
  2. Perform these shifts from a standing start to 72 Km/h (45 mph) with a constant throttle opening of 20 to 25 degrees.
  3. With speeds below 40 Km/h (25 mph), make five to eight wide open throttle kickdowns to 1st gear. Allow at least five seconds each in 2nd and 3rd gear between each kickdown.
  4. With the scan tool, read DTCs.