LEMON Manuals: Even more car manuals for everyone
Home >> Jeep >> 2012 >> Compass Limited, AWD, Automatic CVT, CVT2L >> Repair and Diagnosis >> External Pages >> Different car >> Section 425 (Ignition System (Service Information)) >> Solenoid, Variable Valve Timing >> Removal >> Right

Solenoid, Variable Valve Timing: Removal: Right

WARNING: This page is about a different car, the 2015 Chrysler 300. However, it is still accessible from the selected car via links, so may be relevant.
  1. Disconnect and isolate the negative battery cable.
    Fig 1: Engine Cover
    GC0144028Courtesy of CHRYSLER GROUP, LLC
  2. Remove the engine cover (1).
  3. Remove the air cleaner body. Refer to BODY, AIR CLEANER, REMOVAL .
    NOTE:

    Mark the Variable Valve Timing Solenoid (VVTS) connectors (1) with a paint pen or equivalent so that they may be reinstalled in their original locations.

  4. Mark the intake VVTS (2) and the exhaust VVTS solenoid (4) with a paint pen or equivalent so that they may be reinstalled in their original locations.
    Fig 2: Variable Valve Timing Solenoids, Connectors & Bolts
    GC0144211Courtesy of CHRYSLER GROUP, LLC
  5. Disconnect the VVTS wire harness connector (1).
  6. Remove bolts (3) and pull the VVTS from the cylinder head cover.
    Fig 3: VVT Seal
    GC0144209Courtesy of CHRYSLER GROUP, LLC
  7. The seal (1) can be reused if not damaged.