Module, Integrated Center Stack Screen: Installation: Mid
WARNING: This page is about a different car, the 2012 Dodge Charger. However, it is still accessible from the selected car via links, so may be relevant.
- Position the (ICS) screen module (2) into the bezel and install the retainers (1).
- Connect the harness connectors (2 & 3) to the rear of the Integrated Center Stack (ICS) screen module (1).
NOTE:
In the event that the locking tab breaks or is broken, do not replace the harness. The connector will still lock and the harness will still function as designed.
- Carefully connect the 40 - way connector (1).
- Install the instrument cluster bezel (2). Refer to BEZEL, INSTRUMENT CLUSTER, INSTALLATION .
- Connect the negative battery cable.