LEMON Manuals: Even more car manuals for everyone
Home >> Jeep >> 2012 >> Compass Latitude, 2.0 A >> Repair and Diagnosis >> External Pages >> Different car >> Section 191 (Electronic Control Modules (Service Information)) >> Module, Integrated Center Stack Screen >> Installation >> Base

Module, Integrated Center Stack Screen: Installation: Base

WARNING: This page is about a different car, the 2012 Dodge Charger. However, it is still accessible from the selected car via links, so may be relevant.
Fig 1: Retainers
GC0145110Courtesy of CHRYSLER GROUP, LLC
  1. Position the (ICS) screen module into the bezel and install the retainers (1).
    Fig 2: Harness Connectors & Integrated Center Stack (ICS) Screen Module
    GC0144619Courtesy of CHRYSLER GROUP, LLC
  2. Connect the harness connectors (2 & 3) to the rear of the Integrated Center Stack (ICS) screen module (1).
    Fig 3: Way Connector
    GC0144026Courtesy of CHRYSLER GROUP, LLC
    NOTE:

    In the event that the locking tab breaks or is broken, do not replace the harness. The connector will still lock and the harness will still function as designed.

  3. Carefully connect the 40 - way connector (1).
    Fig 4: Instrument Cluster Bezel Retainer & Bezel
    GC0145130Courtesy of CHRYSLER GROUP, LLC
  4. Install the instrument cluster bezel (2). Refer to BEZEL, INSTRUMENT CLUSTER, INSTALLATION .
  5. Connect the negative battery cable.