5.7L Engine
| 1 - FRONT OF INTAKE MANIFOLD |
| 2 - ELECTRICAL CONNECTOR |
| 3 - ECT SENSOR |
- Apply thread sealant to sensor threads.
- Install sensor into engine.
- Tighten sensor to 11 N.m (8 ft. lbs.) torque.
- Connect electrical connector to sensor.
- Carefully bolt air conditioning compressor onto the front of engine.
- Install accessory drive belt. See Cooling/Accessory Drive/BELT, Serpentine - Installation .
- Replace any lost engine coolant. See Cooling - Standard Procedure .