LEMON Manuals: Even more car manuals for everyone
Home >> Jeep >> 2009 >> Commander Overland, 4WD >> Repair and Diagnosis >> Body & Frame >> Door Locks >> Power Liftgate System (Service Information) >> ROD, Link >> Installation >> Installation

ROD, Link: Installation: Installation

Fig 1: Link Rod Components
GC0132176Courtesy of CHRYSLER LLC
  1. Install the drive unit end of the link rod (1) onto the mounting sphere by gently pushing straight on.
  2. Install the liftgate end of the link rod (1) onto the liftgate (3) pivot bracket (2) by gently pushing straight on.
    Fig 2: Plastic Retainer And Mounting Sphere
    GC0132177Courtesy of CHRYSLER LLC
  3. Push the plastic retainer (1) down to lock the link rod mounting sphere (2) into position for both ends of the link rod.
  4. Install the D-pillar trim on the vehicle. Refer to Body/Interior/PANEL, D-Pillar Trim - Installation for the procedure.
  5. Perform the power liftgate learn cycle. See Standard Procedure  .